The common mistake with a customer handover pack is thinking the job ends when the boiler fires or the lights come on. The manual stays in its plastic bag on the side, the certificate is "coming from the scheme", and the serial number never gets written down. Eighteen months later the customer rings because the boiler has a fault, the maker wants the warranty number, and neither of you has it.
A handover pack fixes that in ten minutes before you leave. Below is a handover sheet to print or copy, what belongs in the pack, the certificates each type of job produces and who sends them, what the law says you leave behind, who registers the warranty, and the mistakes that bring customers back on the phone. It's written for heating engineers, plumbers, electricians, builders and anyone who fits something a customer will have to live with. For the rest of the job record, see the guide to running and recording trade jobs.
Print this sheet for every handover
Fill in the top before you arrive, the rest as you finish, and go through it with the customer before you leave. Leave one copy with them and keep one with the job.
Leave a line blank rather than guessing. A blank "Register by" date on your copy is a reminder that someone still has to find out the maker's deadline. A guessed date is how a warranty lapses.
What goes in the handover pack
A handover pack is everything the customer needs to use what you fitted, keep it working and prove it was fitted properly. For most jobs that's a short wallet of papers or one email with attachments. It has six parts:
- The handover sheet above, with what you did, what you fitted and who to call.
- Certificates: the installation certificate you complete yourself, and the Building Regulations compliance certificate that follows from your scheme.
- The commissioning record for anything that has one, such as the Benchmark checklist that comes with a gas boiler.
- The manufacturer's instructions for every appliance and control you fitted.
- Warranty details: the length, who registers it, by when, and the confirmation number once it's done.
- Your own guarantee, if you give one, and how to contact you.
Put the pack together while you're still on site. Every part of it depends on something you can only check there: the serial number on the appliance, the readings on the commissioning record, or the instructions that came in the box. If you leave it for the office to assemble later, it arrives late or not at all.
Certificates by type of job
The certificate a customer gets depends on the work and on how it's notified. Gas Safe Register says that in England and Wales the local authority must always be told when a heat-producing gas appliance is installed, so that a Building Regulations Compliance Certificate can be issued. Your business notifies it through Gas Safe Register within 30 days of installation, and the customer gets the certificate in the post in 10 to 15 working days.
For electrical work, Electrical Safety First says that most fixed electrical work in homes in England and Wales must comply with Part P of the Building Regulations. Apart from some minor tasks, the work must either be reported to building control or carried out by an electrician registered with a government-approved scheme. When a registered electrician finishes, the customer should get an Electrical Installation Certificate or Minor Works Certificate confirming the work meets BS 7671, and a Building Regulations Compliance Certificate.
| Type of job | What the customer gets | Who provides it | When |
|---|---|---|---|
| Boiler, gas fire or other heat-producing gas appliance (England and Wales) | Building Regulations Compliance Certificate | Gas Safe Register, after you notify the work | Notify within 30 days; certificate 10 to 15 working days later |
| Consumer unit change or new circuit | Electrical Installation Certificate, and a Building Regulations Compliance Certificate | You, and your scheme for the compliance certificate | Installation certificate on the day; compliance certificate when your scheme issues it |
| Small addition to an existing circuit | Minor Works Certificate | You | On the day |
| Other notifiable work done through a competent person scheme | The scheme's compliance certificate | Your scheme | When your scheme issues it |
| Work that isn't notifiable | No compliance certificate; the handover sheet and product paperwork | You | On the day |
Write the certificate you're waiting for on the handover sheet, with the date it should arrive. When the customer rings to ask where it is, the office can answer in one look, and if it hasn't come, you know before they do. Gas Safe Register also tells homeowners it's up to them to make sure the engineer notifies the installation, so a customer who hears nothing may check online and ring you anyway.
Tell the customer to keep the compliance certificate with the house papers. Gas Safe Register points out that it belongs to the property, and that it's useful if they sell or remortgage. A buyer's solicitor asking for it years later is a common reason for a call to the installer.
These certificate rules are for England and Wales. Scotland uses a building standards system, and Electrical Safety First says there's currently no equivalent statutory requirement for domestic electrical work in Northern Ireland. Check your scheme's own rules for where the work is.
The law on leaving instructions
Leaving the manufacturer's instructions isn't only good manners. Regulation 29 of the Gas Safety (Installation and Use) Regulations 1998 says anyone who installs a gas appliance must leave for the owner or occupier all the instructions the manufacturer provided with it. The Northern Ireland gas safety regulations contain the same rule. So the booklet in the boiler box belongs to the customer, not in the van.
Regulation 40 of the Building Regulations 2010 covers a wider range of work. Where the energy efficiency requirements apply, the person carrying out the work must, within five days of finishing, give the owner enough information about the building, the fixed building services and their maintenance requirements for it to be run without using more fuel and power than is reasonable. In practice, for a new heating system or new controls, that means operating and maintenance instructions for what you fitted, left with the owner.
Five days is a short window. If you rely on posting the instructions later, they're likely to miss it. Put them in the wallet before you leave, or email them the same day, and tick them off on the sheet.
The Building Regulations 2010 apply in England and Wales, and the Gas Safety (Installation and Use) Regulations 1998 in Great Britain, with matching regulations in Northern Ireland. This is not legal advice. It summarises the Gas Safe Register, legislation and Electrical Safety First pages linked here. Check your scheme's guidance, and the current version of each rule, before relying on this summary.

Commissioning records and the Benchmark checklist
Gas Safe Register tells homeowners that once a gas installation is finished, they should get completed commissioning documents from the engineer, such as the Benchmark certificate for a boiler. A customer who has read that will look for it in the pack, and a missing one is the first thing they'll ask about.
Fill in the commissioning record as you commission, not from memory in the van. Write the readings as you take them, sign it, and photograph the completed page before you hand it over. If the original goes missing, your photo is the only record of what the appliance did on the day you left it.
The same applies beyond boilers. Cylinders, heat pumps, pumps and showers often come with their own commissioning or installation record. If the box has one, fill it in and leave it. If it doesn't, write the key settings on the handover sheet, so the next engineer can see what you set.
Who registers the warranty?
The appliance owner usually does, unless you agree to do it for them. Gas Safe Register tells homeowners that warranty registration has to be completed and returned by the appliance owner, such as the homeowner or landlord. Many installers register for the customer anyway. Whichever you choose, agree it before you leave and write the name on the sheet.
That point is often left out, and it matters. If the customer thinks you registered the boiler and you think they did, it doesn't get done, and the warranty may drop to the maker's standard terms or lapse. Check the manufacturer's own conditions for each product you fit. Warranty terms often depend on registering within a set period, on the commissioning record being completed, and on servicing at the intervals the maker sets.
If you offer to register it, you own the deadline. Do it on site from your phone if you can, and write the confirmation number on both copies of the sheet. If you can't do it there, put a dated task against the job, and don't mark the job complete until it's done.
If the customer registers it, show them where the serial number is, write the deadline on their copy, and say it out loud: "You need to register this with the maker by the 20th, or the extended warranty won't apply." A short message the same day helps it stick. The wording below is an invented example: change the bracketed parts to match the product and the maker's terms.
Show the customer the controls before you leave
Most callbacks in the first week aren't faults. A customer can't work the timer, turned the wrong valve, or doesn't know what the new switch does. Ten minutes showing them saves a return visit.
Walk them through what they'll touch, in the order they'll need it. For heating, that's the programmer or thermostat, how to read the pressure gauge and top up the system, and where the isolator and the gas shut-off are. For electrical work, that's what each circuit on the board controls, how to reset a tripped device, and the test button they should press at the interval on the label. For plumbing, that's the stop tap and any isolating valves you fitted.
Let the customer do it while you watch, rather than doing it for them. Then tick the line on the sheet. If they can't manage the controls on their own, note it, and say who in the household you showed. That's the record that you did more than leave a booklet.

Your own guarantee and aftercare
If you give your own guarantee on your workmanship, put it in the pack in plain words: what it covers, for how long, and how to contact you. "Workmanship guaranteed for 2 years: if anything we fitted fails because of how we fitted it, call us on the number above and we'll put it right" tells the customer what they're getting.
Don't word it as if it replaces the customer's rights. A guarantee you give comes on top of what the law already gives a homeowner when work is faulty, and our snagging list template explains those rights. Keep the guarantee short and separate from the manufacturer's warranty, so the customer knows which to use for what.
Add the first service date if the product needs one. A line saying "First service due: 12 months from today" is a reminder for the customer and a booking for you, and many warranties depend on it being done.
Paper, email or a shared folder
Paper still works for a lot of customers, especially older homeowners. A clear wallet with the sheet on top, the certificates behind it and the booklets at the back can be kept in a drawer and found again. Write the job reference on the wallet.
Email suits most other customers. Send one email the same day, with the handover sheet, photos of the commissioning record and certificates, and links or PDFs of the manufacturer's instructions. Put the address and the job in the subject line, so it can be found again in three years. When the compliance certificate arrives, send it on as a reply to the same email.
Keep your own copy of everything with the job, not on an engineer's phone. Our job sheet template has fields for the certificate and serial number, and our checklist of photos to take on a job covers the data plate and commissioning photos. When the customer, a buyer's solicitor or the manufacturer asks, the office can answer from the job record.
Handover packs for landlords and letting agents
On a rented property, the person who pays and the person who lives there are different, and both need something from the handover. The landlord or agent needs the certificates, the warranty details and the job summary for their records. The tenant needs the instructions and the controls walk-through, because they're the one who'll use the heating.
Agree before the job who gets what, and write it on the sheet. Send the landlord's pack by email with the job and property address in the subject line, and leave the instructions at the property. If the warranty has to be registered by the owner, tell the landlord or agent, not just the tenant. A handover sheet signed by a tenant who doesn't own the boiler won't get the warranty registered. Our guide to landlord and letting agent jobs covers how orders, approvals and invoices work when someone else pays.
Handover mistakes that cause callbacks
Most handover problems show up months later, when no one remembers what was left. These are the ones to watch for.
| Mistake | What happens | Fix |
|---|---|---|
| Instructions left in the van or the bin | The customer can't work the controls and rings you | Put every booklet in the wallet or email it the same day |
| No serial number recorded | The maker can't find the warranty, and nor can you | Write it on the sheet and photograph the data plate |
| No one agrees who registers the warranty | It isn't registered and may lapse | Write the name and the date on the sheet |
| Commissioning record filled in later from memory | It doesn't match the appliance, and it won't help in a dispute | Fill it in as you commission and photograph it |
| Certificate "coming from the scheme" with no date | The customer chases, and you don't know if it was notified | Write the expected date on the sheet and check it |
| Pack sent to the tenant only | The landlord has no certificates or warranty details | Agree who gets what before the job |
Put a handover sheet in the van this week
Print a few copies of the handover sheet, or copy it into your job app, and put a clear wallet with each. On the next job, fill it in before you leave and go through it with the customer. Then check the job a fortnight later: has the certificate arrived, is the warranty registered, and does your copy have every serial number? Then send the final invoice; our guide to getting paid covers payment terms and chasing.
Find an app that keeps the paperwork, then send the invoice
Sources checked for this guide
Certificate, notification, instruction and commissioning points checked against Gas Safe Register, the Gas Safety (Installation and Use) Regulations 1998, the Building Regulations 2010 and Electrical Safety First. These are the primary sources used in this guide.
- Gas Safe Register, Building Regulations certificates
- Gas Safe Register, New gas appliance installation
- legislation.gov.uk, Gas Safety (Installation and Use) Regulations 1998, regulation 29
- legislation.gov.uk, Building Regulations 2010, regulation 40
- Electrical Safety First, Part P of the Building Regulations